Block 22 : Brick Work Completed till 9th floor (20.05.2013)
Block 22 : Final Slab Casting (16.05.2013)
Block 23 : 9th Floor Casting (17.05.2013)
Block 23 : Brick Work Completed till 3th floor (20.05.2013)
Block 24 : Ground Floor Casting (06.03.2013)
Block 25 : Piling Work Done (14.07.2012)
 